.

Project Group ICON

[Active Members] [Further Members] [Objectives] [ Meetings] [Reports] [Material]

Coordinators

Klaus Keuler, Christian Steger

Wiki ICON

Active Members

Jennifer Brauch, Marcus Breil, Susanne Brienen, Barbara Früh, Beate Geyer, Patrick Jöckel, Astrid Kerkweg, Bastian Kern, Klaus Keuler, Mariano Mertens, Gregor Pante, Burkhardt Rockel, Christian Steger

 

Further Members

Erwan Brisson, Andreas Prein, Sonia Seneviratne, Christoph Stegert, Trang Van Pam, Heimo Truhetz, Merja Tölle, Andreas Will

 

Objectives

The joint development by DWD and MPI-M of the new nonhydrostatic weather and climate modelling framework ICON has made considerable progress in recent years. At DWD ICON (13 km grid spacing, 90 layers) has already replaced the former NWP model GME (20 km grid spacing, 60 layers). The higher resolution European nest (6.5 km grid spacing) in ICON is also already operational and has replaced the regional model COSMO-EU (7km grid spacing, 40 layers). The ICON software and documentation is available to the scientific community (license aggrement necessary). For the next few years, COSMO will still be used in very high-resolution regional applications (COSMO-DE, COSMO-DE-EPS), but until 2020 the whole COSMO system is planned to be replaced entirely by the ICON modelling framework in cooperation with the COSMO Consortium and KIT (for the ART application). It is important for the CLM community to be prepared for a migration to the ICON modelling framework.

 

The aim is to make the first steps with the ICON software soon after the release to the scientific community. The main objectives of this project group are to:

  • inform the community about the timelines and progress of the ICON development
  • prepare a working plan (plan of action) including an overview of the work packages necessary for using the ICON modelling framework in the context of regional climate studies and to organize its implementation,
  • design and conduct test suites of the new regional mode of the ICON model in comparison to COSMO-CLM model results,
  • and to present the results to the CLM Community.

 

Road map

 

 

Meetings / Events

DateMeeting and LocationDocuments
2013/10/15PG Web-conference (PG-strategy)

Icon PDF Minutes [24 Kb]

2013/12/12ICON all staff meeting, DWD Offenbach

Icon PDF Summary (You are not authorised to download.)[73 Kb]

Icon PDF Presentation (You are not authorised to download.)[569 Kb]

2014/03/20PG meeting at COSMO-CLM user seminar, DWD Offenbach

Icon PDF Presentation (You are not authorised to download.)[976 Kb]

2014/07/07-09ICON training course 2014, BTZ Langen

Icon PDF Summary (You are not authorised to download.)[43 kb]

2014/09/03PG meeting at CLM-Assembly 2014, Frankfurt

Icon PDF Minutes [84 kb]

2016/03/10PG meeting at COSMO-CLM user seminar, DWD Offenbach

Icon PDF Summary [85 kb]

2016/09/21PG meeting at CLM-Assembly 2016, Lüneburg

Icon PDF Summary (You are not authorised to download.)[107 kb]

2017/03/09PG meeting at COSMO-CLM user seminar, DWD Offenbach

Icon PDF Summary (You are not authorised to download.)[105 kb]

Icon PDF Presentation Daniel Reinert (You are not authorised to download.)[1.75 mb]

 

Annual Reports

Annual report 2013-2014 [pdf-document, 44kb]

Annual report 2014-2015 [missing due to suspended activities]

 

 

Further Material

Information on the licence agreement required for using the ICON model and material of the latest ICON tutorial (including a test veriosn of the model) are available on th PG's RedC Page

 

= CLM-Community login required



.